  1. Steel plate pile construction is permanent buildings such as docks, cargo farms, shores, rocks, fixation, warehouses, diversion embankments, buoyanti, docks, water diversion pipes, foundations, anti -seepage walls, waterproof walls, etc. Tusha collapse to prevent temporary structures such as panels, temporary shores, coffin engineering, closed, and temporary center islands, etc. It is often applied. Domestic construction is completed by professional construction enterprises.
    (1) Piles should be closed at the tip of the pile before entering to avoid squeeze in the soil. The lock port should be applied with butter or other oils. For the long -term disrepair, the lock port deforms, and the steel plate piles with severe rust should be renovated and corrected, bending and deformable piles, and can be corrected with oil pressure jack pressure or fire baking.
    (2) Division of pile flowing segments.
    (3) During the pile process. To ensure the verticality of the steel plate pile. Use two latitudes to control in two directions.
    (4) The position and direction of the two steel plate piles that start to be set should be ensured to be accurate in order to play a guided model. The steel plate and stent bracket welding is temporarily fixed.

  2. The construction of steel plate piles refers to the construction process of reaching the basic pit support during the construction of steel plate piles during the construction. Steel plate pile construction is permanent buildings such as docks, cargo farms, shores, rocks, fixation, warehousing, floats, docks, water rivers, foundations, anti -seepage walls, waterproof walls, foundation, etc. The retaining wall, the collapse of Tusha is often used in the process of temporary structures such as plates, temporary protection shores, coffin engineering, closed, and temporary center islands. Domestic construction is completed by professional construction enterprises.